Examining Residual Risk After a Mine Safety Investigation
Back to Projects- Risk Management
- South Africa
- South32
- Manganese
South32, Wessels Mine, requested that VBKOM evaluate residual risk potential and various remedial recommendataions related to a section 54 investigation. The work programme incorporated the key activities and outputs identified for the assignment, including Risk Management and Review.
The approach was developed around the specific requirements of Manganese Surface Mining in South Africa, ensuring that the technical assessment remained relevant to the project's operating conditions and study objectives.
The work was coordinated to maintain consistency across the technical inputs, activities and outputs, while keeping the assignment aligned with the agreed project objective and intended use of the results.
Technical inputs, assessments and deliverables were coordinated throughout the assignment to maintain consistency and alignment with the defined project objectives. The work was undertaken with due consideration for the intended application of the results, with findings captured through structured and traceable documentation. Collectively, the completed outputs provided a coherent technical basis for client review and supported informed consideration of subsequent project activities, decisions and development requirements.