Updating a Gold Resource Model and Mineral Resource Statement

Back to Projects
Project
Geology, Mining Engineering, Metallurgy
Country
Zimbabwe
Client
Confidential
Commodity
Gold

VBKOM was appointed to undertake a technical review of the project and provide geological wireframe modelling, blockmodelling and an updated Mineral Resource Statement.

The work programme brought together the technical activities required to address the assignment and translate the available information into practical project outputs., including a Competent Person's Report, Competent Person's Review, as well as Metallurgical Review & Recommendations.

The technical approach was tailored to the specific requirements of the Gold Underground mining operation in Zimbabwe, with the prevailing project, operational and study conditions informing the assessment throughout.

Technical inputs, assessments and deliverables were coordinated throughout the assignment to maintain consistency and alignment with the defined project objectives. The work was undertaken with due consideration for the intended application of the results, with findings captured through structured and traceable documentation. Collectively, the completed outputs provided a coherent technical basis for client review and supported informed consideration of subsequent project activities, decisions and development requirements.

Trays of drill core samples